Porthcawl Town Beach

The main construction works are due to commence on Monday, 8th January and will continue for approximately 52 weeks. The scheme will primarily consist of the following:

  • Excavation of the existing beach area
  • The construction of a rock armoured toe
  • Installation of reinforced precast concrete terraced units
  • Surfacing and repair works to the existing beach access ramps
  • Localised breaking out and concrete repairs to defective areas of the existing sea wall
  • Repairs and re pointing works to existing stonework revetment

Information evenings:

An information evening will be held for all local businesses and residents in the New Year. At the evening you will be able to see details of the works, the construction programme and our measures to reduce disruption. Representatives from Griffiths and Bridgend County Borough Council will be available to answer any questions you may have. Details of the information evening will be advertised once they have been confirmed.

 